Microsoft Dynamics AX 2012 Trade and Logistics Sample Questions:
1. Your company sells home entertainment center products. For home entertainment center item 1203, the customer must choose between two DVD player models: item 1701 or item 1702.
You need to set up the bill of materials (BOM) for item 1203 so that the system prompts for the customer's choice of DVD player during sales order entry.
In Microsoft Dynamics AX 2012, what should you do?
A) Attach the same configuration group to items 1701 and 1702 in the BOM.
B) Attach the same configuration route to items 1701 and 1702 in the BOM.
C) Create a configuration rule for items 1701 and 1702.
D) Create and activate two separate BOMs for item 1203, one for each DVD player.
2. In Microsoft Dynamics AX 2012, which of the following are valid options for setting up the picking process? (Choose all that apply.)
A) Manual One Step Process
B) All orders that do not require manual allocation
C) Automatic reduction, picking list
D) Automatic
E) Manual Two Step Process
3. When performing a product trace in Microsoft Dynamics AX 2012, which setting on the Trace inventory dimensions form allows you to trace a serial number or batch number to see where the products have been used?
A) Forward
B) Warehouse
C) Backward
D) Date Check
4. In Microsoft Dynamics AX 2012, you are using a constant scrap amount and variable consumption for all line items of a bill of materials (BOM) item.
What will happen to the cost in the BOM calculation as the size of the production batch increases?
A) The BOM item s overall cost will decrease.
B) The BOM lines total cost will double for each quantity unit increase in the production batch size.
C) The BOM lines total cost will increase in proportion to the production batch size.
D) The BOM item s overall cost will remain the same.
5. In Microsoft Dynamics AX 2012, you have a new configurable bill of materials (BOM).
What must you do, and in what order, before this future BOM item can be sold?
A) Create the BOM item. Assign the item configurations and attach them to the previously created BOM. Approve and activate the BOM. Then create the sales order.
B) Create the BOM item and attach it to the previously created BOM. Create the sales order. Approve and activate the BOM. Then assign the item configurations.
C) Create, approve, and activate the BOM item. Assign the item configurations and attach them to the previously created BOM. Then create the sales order.
D) Create the BOM item and attach it to the previously created BOM. Approve and activate the BOM. Assign the item configurations. Then create the sales order.
Solutions:
| Question # 1 Answer: A | Question # 2 Answer: A,D,E | Question # 3 Answer: A | Question # 4 Answer: A | Question # 5 Answer: D |


PDF Version Demo






We are confident about the products and aim to help you pass with ease. In case of failure, we will provide a no hassle full money back guarantee for the purchasing fee.
1215 Customer Reviews
Quality and ValueITbraindumps Practice Exams are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development - no all study materials.
Tested and ApprovedWe are committed to the process of vendor and third party approvals. We believe professionals and executives alike deserve the confidence of quality coverage these authorizations provide.
Easy to PassIf you prepare for the exams using our ITbraindumps testing engine, It is easy to succeed for all certifications in the first attempt. You don't have to deal with all dumps or any free torrent / rapidshare all stuff.
Try Before BuyITbraindumps offers free demo of each product. You can check out the interface, question quality and usability of our practice exams before you decide to buy.