McAfee Secure sites help keep you safe from identity theft, credit card fraud, spyware, spam, viruses and online scams
My Cart (0)  

100% Microsoft 074-343 Guaranteed Success With Testing Engine

Exam Code: 074-343

Exam Name: Managing Projects with Microsoft Project 2013

Updated: Jun 10, 2026

Number: 110 Q&As with Testing Engine

074-343 Free Demo download

PDF Version Demo PC Test Engine Online Test Engine

Already choose to buy "APP"

Price: $59.99 
Get real 074-343 exam questions as your practice reference, and pass your test with our valid and updated 074-343 exam engine.

Exam IntroProduct ScreenshotsFAQ

Topics of 74-343: Managing Projects with Microsoft Project Exam

Candidates must know the exam topics before they start of preparation. because it will really help them in hitting the core. Our Microsoft 74-343: Managing Projects with Microsoft Project exam dumps will include the following topics:

1. Initialize a project (15-20%)

Create a new project

  • Create a template from a completed project, create a project from an existing template, existing project, SharePoint task list, or Excel workbook

Create and maintain calendars

  • Set working or non-working hours and days for calendars, set a base calendar, resource calendar, and hours per day, apply calendars to project, task, and resource levels

Create custom fields

  • Create basic formulas, graphical indicator criteria, lookup tables, and task and resource custom fields

Customize option settings

  • Set default task types, manual versus auto-scheduling, project options, calendar options, customized ribbon, and quick access toolbar

2. Create a task-based schedule (20-25%)

Set up project information

  • Define project start date, apply calendars and current date, enter project properties, display the project summary task on a new project

Create and modify a project task structure

  • Create and modify summary tasks and subtasks, rearrange tasks, create milestones, create manually scheduled tasks, outline, set tasks as active or inactive

Build a logical schedule model

  • Set date constraints, deadlines, dependencies, links, duration equations, effort-driven tasks, and formulas, choose a task type

Create a user-controlled schedule

  • Enter duration, set or change the task mode (manual or auto), display warnings and suggestions, use estimated durations and user-controlled summary tasks

Manage multiple projects

  • Create a shared resource pool, connect to a resource pool, create links between projects, resolve conflicts between linked projects, work with master projects and sub-projects, summarize data in master projects.

3. Manage resources and assignments (20-25%)

Enter and edit resource information

  • Enter and edit max units, resource types, resource rate table, cost per use, availability, resource group, generic resources, and cost resources

Create and edit resource assignments

  • Use task forms, assign multiple resources, assign resources to tasks using units that represent part-time work, edit assignments

Manage resource allocation

  • View task and resource usage, view availability across multiple projects, change assignment information, level, replace resources

Manage resource allocations by using Team Planner

  • Display current resource allocations and assignments, manage unassigned tasks, resolve resource conflicts, level resource over-allocations, substitute resources

Model project costs

  • Enter and assign resource-based costs (work, material, cost), cost per use, fixed costs, accrual method, apply a resource rate table

4. Track and analyze a project (20-25%)

Set and maintain baselines

  • Use multiple baselines, baseline an entire project, baseline selected tasks, update a baseline Update actual progress

  • Update percentage completion, actual or remaining duration, actual work, remaining work, status date, current date, actual start and actual finish, use actual work and usage views, reschedule uncompleted work, cancel an unneeded task

Compare progress against a baseline

  • Use date variance, work variance, cost variance, and task slippage, show variance of the current plan against baseline (tracking Gantt), select a view to display variance

Resolve potential schedule problems

  • Display warnings, suggestions, and task drivers by using Task Inspector and Task Path, identify resource over-allocations

Display critical path information

  • View the critical path in single or master projects, view total slack, display progress against baseline or deadlines

5. Communicate project information (15-20%)

Apply and customize views

  • Use auto-filter, apply views, group, filter, highlight, create and manage tables, sort, customize views, share a view with Organizer

Share data with other applications

  • Import data from Excel, export data to Excel, attach documents or link hyperlinks to supporting information, copy and paste timeline and reports to other Office Web Apps, create and generate visual reports in Excel and Visio, export a timeline view to email

Configure and display reports and dashboards

  • Report progress status, save to PDF or XPS, display Gantt information, schedule, or timeline, display data based on date range, create built-in dashboards and reports, change and customize built-in dashboards and reports, copy pictures, work with cumulative fields

Connect and share data with SharePoint

  • Sync to SharePoint, share plans and get updates through SharePoint, share project plans through SharePoint (bi-directional sync of tasks, progress, and timeline elements), collect actual progress from a team through SharePoint

Extend Project

  • Acquire Apps from the Office Store, save files in OneDrive for Business, acquire templates from Office.com, automate frequent tasks with Visual Basic for Applications (VBA)

Reference: https://www.microsoft.com/en-us/learning/exam-74-343.aspx

Microsoft 74-343 Exam Syllabus Topics:

TopicDetailsWeights
Create a task-based schedule

Set up project information
-Define project start date, apply calendars and current date, enter project properties, display the project summary task on a new project

Create and modify a project task structure
-Create and modify summary tasks and subtasks, rearrange tasks, create milestones, create manually scheduled tasks, outline, set tasks as active or inactive

Build a logical schedule model
-Set date constraints, deadlines, dependencies, links, duration equations, effort-driven tasks, and formulas, choose a task type

Create a user-controlled schedule
-Enter duration, set or change the task mode (manual or auto), display warnings and suggestions, use estimated durations and user-controlled summary tasks

Manage multiple projects
-Create a shared resource pool, connect to a resource pool, create links between projects, resolve conflicts between linked projects, work with master projects and sub-projects, summarize data in master projects

20–25%
Initialize a project

Create a new project
-Create a template from a completed project, create a project from an existing template, existing project, SharePoint task list, or Excel workbook

Create and maintain calendars
-Set working or non-working hours and days for calendars, set a base calendar, resource calendar, and hours per day, apply calendars to project, task, and resource levels

Create custom fields
-Create basic formulas, graphical indicator criteria, lookup tables, and task and resource custom fields

Customize option settings
-Set default task types, manual versus auto-scheduling, project options, calendar options, customized ribbon, and quick access toolbar

15–20%
Manage resources and assignments

Enter and edit resource information
-Enter and edit max units, resource types, resource rate table, cost per use, availability, resource group, generic resources, and cost resources

Create and edit resource assignments
-Use task forms, assign multiple resources, assign resources to tasks using units that represent part-time work, edit assignments

Manage resource allocation
-View task and resource usage, view availability across multiple projects, change assignment information, level, replace resources

Manage resource allocations by using Team Planner
-Display current resource allocations and assignments, manage unassigned tasks, resolve resource conflicts, level resource over-allocations, substitute resources

Model project costs
-Enter and assign resource-based costs (work, material, cost), cost per use, fixed costs, accrual method, apply a resource rate table

20–25%
Track and analyze a project

Set and maintain baselines
-Use multiple baselines, baseline an entire project, baseline selected tasks, update a baseline

Update actual progress
-Update percentage completion, actual or remaining duration, actual work, remaining work, status date, current date, actual start and actual finish, use actual work and usage views, reschedule uncompleted work, cancel an unneeded task

Compare progress against a baseline
-Use date variance, work variance, cost variance, and task slippage, show variance of the current plan against baseline (tracking Gantt), select a view to display variance

Resolve potential schedule problems
-Display warnings, suggestions, and task drivers by using Task Inspector and Task Path, identify resource over-allocations

Display critical path information
-View the critical path in single or master projects, view total slack, display progress against baseline or deadlines

20–25%
Communicate project information

Apply and customize views
-Use auto-filter, apply views, group, filter, highlight, create and manage tables, sort, customize views, share a view with Organizer

Share data with other applications
-Import data from Excel, export data to Excel, attach documents or link hyperlinks to supporting information, copy and paste timeline and reports to other Office Web Apps, create and generate visual reports in Excel and Visio, export a timeline view to email

Configure and display reports and dashboards
-Report progress status, save to PDF or XPS, display Gantt information, schedule, or timeline, display data based on date range, create built-in dashboards and reports, change and customize built-in dashboards and reports, copy pictures, work with cumulative fields

Connect and share data with SharePoint
-Sync to SharePoint, share plans and get updates through SharePoint, share project plans through SharePoint (bi-directional sync of tasks, progress, and timeline elements), collect actual progress from a team through SharePoint

Extend Project
-Acquire Apps from the Office Store, save files in OneDrive for Business, acquire templates from Office.com, automate frequent tasks with Visual Basic for Applications (VBA)

15–20%

Managing Projects with Microsoft Project Exam Certification Details:

Exam Code74-343
Exam NameMicrosoft Certified Professional (MCP) - Microsoft Project
Schedule ExamPearson VUE
Duration120 mins
Number of Questions45-55
Sample QuestionsManaging Projects with Microsoft Project Sample Questions
Passing Score700 / 1000
Exam Price$165 (USD)

Frequently Asked Questions

1. What kinds of study material ITBraindumps provides?

Test engine: study test engine can be downloaded and run on your own devices. Practice the test on the interactive & simulated environment.
PDF (duplicate of the test engine): the contents are the same as the test engine, support printing.

2. How long can I get the products after purchase?

You will receive an email attached with the 074-343 study material within 5-10 minutes, and then you can instantly download it for study. If you do not get the study material after purchase, please contact us with email immediately.

3. Can I get the updated products and how to get?

Yes, you will enjoy one year free update after purchase. If there is any update, our system will automatically send the updated study material to your payment email.

4. What's the applicable operating system of the test engine?

Online test engine can supports Windows / Mac / Android / iOS, etc., because it is the software based on WEB browser. You can use it on any electronic device and practice with self-paced.
Online test engine supports offline practice, while the precondition is that you should run it with the internet at the first time.
PC test engine is suitable for windows operating system, running on the Java environment, and can install on multiple computers.
PDF version: can be read under the Adobe reader, or many other free readers, including OpenOffice, Foxit Reader and Google Docs

5. How does your testing engine works?

Once download and installed on your PC, you can practice test questions, review your 074-343 questions & answers using two different options 'practice exam' and 'virtual exam'.
Virtual Exam - test yourself with 074-343 exam questions with a time limit.
Practice exam - review 074-343 exam questions one by one, see correct answers.

6. How often do you release your products updates?

All the products are updated frequently but not on a fixed date. Our professional team pays a great attention to the exam updates and they always upgrade the content accordingly.

7. Do you have any discounts?

We offer some discounts to our customers. There is no limit to some special discount. You can check regularly of our site to get the coupons.

Contact US:  
 [email protected]  Support

Free Demo Download

Money Back Guarantee

We are confident about the products and aim to help you pass with ease. In case of failure, we will provide a no hassle full money back guarantee for the purchasing fee.

Popular Vendors
Adobe
Alcatel-Lucent
Avaya
BEA
CheckPoint
CIW
CompTIA
CWNP
EC-COUNCIL
EMC
EXIN
Hitachi
HP
ISC
ISEB
Juniper
Lpi
Network Appliance
Nortel
Novell
all vendors

514 Customer ReviewsCustomers Feedback (* Some similar or old comments have been hidden.)

Grate 074-343 exam materials! I will recommend this Itbraindumps to all my classmates!

Sherry

Sherry     5 star  

Many new questions are added.
My friends recommend Itbraindumps to me.

Nelly

Nelly     4.5 star  

I pass the 074-343 today, thanks for a lot! the questions are valid, you can trust them.

Kirk

Kirk     5 star  

Luckily I got your updated version.
My friends will try the test next week.

Felix

Felix     5 star  

Everyone thought I would fail the 074-343 exam and this 074-343 learning braindump was just in time to help me pass it. Yeah, I am happy to say I passed now!

Kenneth

Kenneth     4 star  

Can not believe the 074-343 study materials are so accurate! About 90% test questions are coming from this practice file. It is very useful and helps me get a high score. Good value for time and money.

Murphy

Murphy     5 star  

I have several exams to pass at this month, so i had little time to prepare for this 074-343 test, but passed the exam smoothly with the 074-343 exam dumps. It saved me much time and effort.

Ulysses

Ulysses     4.5 star  

Itbraindumps is really the bub of easy, unique, innovative and very reliable study material for exam preparation. Very recently, I used Itbraindumps only for 1 day make me pass

Eden

Eden     5 star  

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Why Choose ITbraindumps Testing Engine
 Quality and ValueITbraindumps Practice Exams are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development - no all study materials.
 Tested and ApprovedWe are committed to the process of vendor and third party approvals. We believe professionals and executives alike deserve the confidence of quality coverage these authorizations provide.
 Easy to PassIf you prepare for the exams using our ITbraindumps testing engine, It is easy to succeed for all certifications in the first attempt. You don't have to deal with all dumps or any free torrent / rapidshare all stuff.
 Try Before BuyITbraindumps offers free demo of each product. You can check out the interface, question quality and usability of our practice exams before you decide to buy.