EMC D-VXR-DY-01 Exam Overview:
| Certification Vendor: | Dell Technologies |
| Exam Name: | Dell VxRail Deploy v2 Exam |
| Exam Number: | D-VXR-DY-01 |
| Certificate Validity Period: | Credential expiry and renewal follow Dell Technologies Proven Professional policies |
| Related Certifications: | D-VXR-OE-01 VxRail Operate D-VXR-DS-00 VxRail Design |
| Exam Duration: | 120 (split into two parts: 90 + 30) |
| Real Exam Qty: | Not officially published (exam blueprint covers sections and weightings) |
| Exam Price: | USD (varies by region, typically through Pearson VUE / OnVUE) |
| Passing Score: | Pass requirements on both parts (Dell does not publicly publish a single overall %) |
| Available Languages: | English, French, Japanese |
| Exam Format: | Multiple choice, Scenario-based questions |
| Sample Questions: | EMC D-VXR-DY-01 Sample Questions |
| Exam Way: | Proctored exam delivered via Pearson VUE testing centers or OnVUE online proctoring |
| Pre Condition: | Recommended hands-on experience with VxRail deployments and completion of Dell recommended training courses |
| Official Syllabus URL: | https://learning.dell.com/content/dell/en-us/home/certification-overview/certificationandbadges/vxrail-deploy-v2.htmlail-deploy.html |
EMC D-VXR-DY-01 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| VxRail Post-Deployment Procedures | 18% | - Post-installation validation - Configure native backups - Configure required vSAN settings post-deployment |
| Using VxRail Configuration Tools | 4% | - Create VxRail projects and configurations - Review completed configuration for implementation |
| VxRail Deployment Planning | 12% | - Describe physical networking components - Explain vSphere Distributed Switch usage - Describe DNS options - Identify node discovery options - Describe vCenter server role - Describe vSAN options |
| VxRail Hardware Installation and Initialization | 8% | - Configure iDRAC and system time - Installing and cabling hardware - Describe installation procedures |
| VxRail Cluster Upgrade and Expansion | 10% | - Describe scale-out best practices - Describe cluster expansion process - Describe upgrade requirements and activities |
| Network Environment Requirements and Initialization | 8% | - Validate network environment - Configure network settings |
| VxRail Troubleshooting | 6% | - Troubleshooting using vSAN tools - Perform VxRail log collections |
| VxRail REST API | 6% | - Use VxRail REST APIs to perform tasks - Identify REST API functionality |
| Deploying the VxRail Cluster | 24% | - Perform VxRail initialization with managed vCenter - Perform initialization with vSAN ESA - Perform initialization with customer-managed vCenter |
| VxRail Physical Components | 4% | - Describe VxRail cluster architecture - Describe VxRail rack requirements |
EMC Dell VxRail Deploy Sample Questions:
1. You have just upgraded a VxRail Cluster from version 4.5.x to version 4.7.x. You need to ensure that new VxRail 4.7.x nodes will be discovered to enable Cluster expansion. The customer does not want to make any changes to the existing ToR switch infrastructure.
What action is necessary to ensure discovery of the new nodes?
A) Change the Management Network VLAN ID on each new node to match the management VLAN ID of the existing Cluster Restart loudmouth
B) In vCenter, set the VLAN ID of the VxRail Management distributed portgroup to 3939
C) In vCenter, create a new distributed portgroup Private Management Network with VLAN ID 3939
D) Change the Private Management Network VLAN ID on each new node to match the management VLAN ID of the existing Cluster Restart loudmouth
2. What is the maximum number of supported nodes in a VxRail Stretch Cluster?
A) 16
B) 32
C) 30
D) 64
3. What is a requirement for the vSAN Data-at-Rest Encryption?
A) All-Flash or AII-NVMe VxRail
B) External Key Management Server
C) External customer provided vCenter
D) VxRail with at least 3 nodes
4. View the Exhibit.
You are reviewing a VxRail Pre-Installation Site Checklist.
What conclusion can be drawn about the VxRail deployment from the exhibit?
A) Two Top of Rack (ToR) switches will be used
B) Upstream switches will have two ISLs
C) Two Upstream switches will be used
D) Top of Rack (ToR) switches will use two uplink ports
5. Which service determines the primary node after powering on the VxRail nodes during the deployment of a VxRail cluster?
A) Election
B) Loudmouth
C) Mystic
D) Marvin
Solutions:
| Question # 1 Answer: D | Question # 2 Answer: D | Question # 3 Answer: B | Question # 4 Answer: B | Question # 5 Answer: A |


PDF Version Demo






We are confident about the products and aim to help you pass with ease. In case of failure, we will provide a no hassle full money back guarantee for the purchasing fee.
1038 Customer Reviews
Quality and ValueITbraindumps Practice Exams are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development - no all study materials.
Tested and ApprovedWe are committed to the process of vendor and third party approvals. We believe professionals and executives alike deserve the confidence of quality coverage these authorizations provide.
Easy to PassIf you prepare for the exams using our ITbraindumps testing engine, It is easy to succeed for all certifications in the first attempt. You don't have to deal with all dumps or any free torrent / rapidshare all stuff.
Try Before BuyITbraindumps offers free demo of each product. You can check out the interface, question quality and usability of our practice exams before you decide to buy.