Autodesk BIM_MGT_101 Exam Overview:
| Certification Vendor: | Autodesk |
|---|---|
| Exam Name: | Autodesk Certified Professional in BIM Management for Building Design |
| Exam Number: | BIM_MGT_101 |
| Certificate Validity Period: | 3 years |
| Exam Duration: | 120 minutes |
| Related Certifications: | Autodesk Certified Professional in Civil 3D for Infrastructure Design Autodesk Certified Professional in Revit for Architectural Design |
| Available Languages: | English |
| Exam Price: | USD 200 |
| Passing Score: | Pass/Fail (passing score not publicly disclosed) |
| Real Exam Qty: | 45-60 |
| Exam Format: | Selected-response, Multiple choice (single-answer), Multiple choice (multiple-answer), Drag and drop, Matching / object association |
| Sample Questions: | Autodesk BIM_MGT_101 Sample Questions |
| Exam Way: | Available as an online proctored exam (OnVUE) or at an authorized Pearson VUE test center. |
| Pre Condition: | No mandatory prerequisite. Recommended: 4+ years of BIM administration experience, approximately 2,000+ hours using Autodesk BIM software, familiarity with Autodesk AEC authoring tools, Autodesk Forma (formerly Autodesk Construction Cloud), model coordination, BIM Execution Plans, point clouds, and BIM standards such as ISO 19650. |
| Official Syllabus URL: | https://www.autodesk.com/certification/all-certifications/bim-building-design-professional |
Autodesk BIM_MGT_101 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Project Needs Assessment | 28% | - Establish project workflows
|
| Topic 2: Corporate Standards and Documentation | 16% | - Establish BIM standards to align with organizational requirements
|
| Topic 3: Collaboration Process | 36% | - Coordinate multidisciplinary models
|
| Topic 4: Data Management | 20% | - Manage project data
|
Autodesk Certified Professional in BIM Management for Building Design Sample Questions:
Question #1
A federated model has been created for a multidisciplinary project, but clashes are being reported in areas where coordination should already be resolved. Upon investigation, the BIM manager finds that some models were exported with outdated links and local coordinates.
What is the most appropriate next step before proceeding with coordination analysis?
A. Instruct teams to verify model references and coordinate systems before reassembly.
B. Run an additional clash-detection pass with adjusted tolerance thresholds to reduce clash totals.
C. Notify the client and exclude the faulty models from further coordination.
D. Freeze the current model state and ask trades to work around the identified issues.
Question #2
A new project being set up requires consistency across all floor plans. However, because of variations in floor-to-floor heights, the project team needs a different View Range for each level.
What is the most efficient way to accommodate this?
A. Remove the View Template and control View Range through Visibility/Graphics.
B. Deselect the Include box for View Range in the View Template.
C. Keep one View Range for all plans and add Plan Regions as needed.
D. Duplicate the View Template for each view to control its View Range.
Question #3
A BIM manager is reviewing a consultant's architectural model before the next coordination milestone. The project requires each model to conform to a defined naming convention, include COBie parameters, and populate shared parameters according to the Model Element Table. The BIM manager notices that several elements are missing metadata and that some naming is inconsistent.
Which step best supports a systematic evaluation of completeness and compliance with project standards?
A. Ask the design team to re-export the model with updated information based on verbal clarification and metadata from the BIM Execution Plan.
B. Manually review each element in the Model Browser to confirm naming and parameter completeness.
C. Use a model checker or data-validation tool to compare parameter presence, naming conventions, and required values against the established project standard.
D. Filter out incomplete elements in a 3D view and hide them to avoid confusion during coordination.
Question #4
A designer needs to add Area Lines in an Area Plan, but upon adding them, they receive a message stating that none of the created elements are visible.
Where can they check to resolve the issue?
A. Detail Level
B. Visibility/Graphics
C. Plan Region
D. Area Scheme
Question #5
A client is seeking bids from a range of possible fabricators to determine which will win the contract to join the team.
What settings in Autodesk Forma allow a team to distribute files to a party that is not a project member?
A. Audit and Compact the file and then save.
B. Set the permissions of the folder to allow Everyone to access.
C. Centralize the model and have the recipient create a local file.
D. Enable the project for public sharing and send a transmittal from the files.
Solutions:
| Question #1 Answer: A | Question #2 Answer: B | Question #3 Answer: C | Question #4 Answer: B | Question #5 Answer: D |


PDF Version Demo






We are confident about the products and aim to help you pass with ease. In case of failure, we will provide a no hassle full money back guarantee for the purchasing fee.
985 Customer Reviews
Quality and ValueITbraindumps Practice Exams are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development - no all study materials.
Tested and ApprovedWe are committed to the process of vendor and third party approvals. We believe professionals and executives alike deserve the confidence of quality coverage these authorizations provide.
Easy to PassIf you prepare for the exams using our ITbraindumps testing engine, It is easy to succeed for all certifications in the first attempt. You don't have to deal with all dumps or any free torrent / rapidshare all stuff.
Try Before BuyITbraindumps offers free demo of each product. You can check out the interface, question quality and usability of our practice exams before you decide to buy.