SAP C-TS420-1809 Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | SAP Certified Application Associate – SAP S/4HANA Production Planning and Manufacturing (1809) |
| Exam Number: | C-TS420-1809 |
| Certificate Validity Period: | 5 years |
| Exam Duration: | 180 minutes |
| Exam Format: | Multiple response, Multiple choice |
| Exam Price: | $518–$560 USD / €470–€510 EUR (varies by region) |
| Related Certifications: | SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (newer releases) |
| Passing Score: | 63% |
| Real Exam Qty: | 80–95 |
| Available Languages: | English |
| Recommended Training: | S4200 - Production Planning in SAP S/4HANA S4201 - Manufacturing in SAP S/4HANA |
| Exam Registration: | SAP Training & Certification Shop SAP Certification Hub |
| Sample Questions: | SAP C-TS420-1809 Sample Questions |
| Exam Way: | Online proctored or at authorized SAP testing centers |
| Pre Condition: | Recommended: Basic knowledge of SAP ERP PP/MM and S/4HANA fundamentals; prior certification C_TSCM42_66/67 is helpful but not mandatory |
| Official Syllabus URL: | https://training.sap.com/certification/c_ts420_1809-sap-certified-application-associate-sap-s4hana-production-planning-and-manufacturing-1809-g/ |
SAP C-TS420-1809 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Integration & Analytics | 6% | - Embedded analytics for manufacturing - Integration with MM, SD, and QM |
| Topic 2: Production Orders | 16% | - Goods movement and settlement - Order creation and structure - Availability check and scheduling - Order release and confirmation |
| Topic 3: Demand Management & Planning Strategies | 12% | - Make-to-order strategies - Make-to-stock strategies - Demand program and independent requirements |
| Topic 4: Material Requirements Planning (MRP) | 16% | - MRP Live vs classical MRP - MRP parameters and planning run - Procurement proposals and planning results |
| Topic 5: SAP S/4HANA Basics and Simplifications | 8% | - SAP S/4HANA architecture and innovations - Simplification list and scope changes |
| Topic 6: Capacity Planning & Evaluation | 8% | - Capacity leveling and evaluation - Work center load analysis |
| Topic 7: Master Data in Production Planning | 12% | - Routings and production versions - Material master and MRP views - Bill of Materials (BOM) - Work centers and capacity data |
| Topic 8: Advanced Planning & Embedded PP/DS | 12% | - Embedded PP/DS overview - Integration with MRP - Detailed scheduling and capacity planning |
SAP Certified Application Associate – SAP S/4HANA Production Planning and Manufacturing (1809) Sample Questions:
Question #1
What are the three transition scenarios for an S/4HANA implementation?
There are 3 correct answers to this question.
Response:
A. New implementation
B. System upgrade
C. System activation
D. Landscape transformation
E. System conversion
Question #2
Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability.
Which information is required to implement this change request in the scope of check?
There are 2 correct answers to this question.
Response:
A. The checking rule from the business application
B. The checking control for the order type
C. The ATP category for restricted-use stock
D. The checking group from the material master
Question #3
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?
Please choose the correct answer.
Response:
A. Material Master -> Plant Settings -> MRP Group
B. Material Master -> MRP Group -> Plant Settings
C. Plant Settings -> MRP Group -> Material Master
D. MRP Group -> Material Master -> Plant Settings
Question #4
When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default?
There are 2 correct answers to this question.
Response:
A. Archiving of backflush documents
B. Posting of production costs to cost collector
C. Staging of components for the next order in the sequence
D. Reduction of the capacity requirements
Question #5
How can you enhance the system statuses of a production order scenario with user statuses?
Please choose the correct answer.
Response:
A. By defining a status profile and assigning it to the order type
B. By creating a user profile and assigning it to the production scheduling profile
C. By activating the user statuses in status and action management
D. By enhancing the system status customizing table with user statuses
Solutions:
| Question #1 Answer: A,D,E | Question #2 Answer: A,D | Question #3 Answer: B | Question #4 Answer: A,B | Question #5 Answer: D |


PDF Version Demo






We are confident about the products and aim to help you pass with ease. In case of failure, we will provide a no hassle full money back guarantee for the purchasing fee.
985 Customer Reviews
Quality and ValueITbraindumps Practice Exams are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development - no all study materials.
Tested and ApprovedWe are committed to the process of vendor and third party approvals. We believe professionals and executives alike deserve the confidence of quality coverage these authorizations provide.
Easy to PassIf you prepare for the exams using our ITbraindumps testing engine, It is easy to succeed for all certifications in the first attempt. You don't have to deal with all dumps or any free torrent / rapidshare all stuff.
Try Before BuyITbraindumps offers free demo of each product. You can check out the interface, question quality and usability of our practice exams before you decide to buy.