IBM C4040-123 Exam Overview:
| Certification Vendor: | IBM |
| Exam Name: | IBM Power Systems with POWER7 and AIX & Linux Sales Skills - v2 |
| Exam Number: | 000-123 |
| Available Languages: | English |
| Exam Format: | Multiple choice |
| Recommended Training: | IBM Power Systems Training |
| Exam Registration: | Pearson VUE IBM Exams IBM Training and Certification |
| Sample Questions: | IBM C4040-123 Sample Questions |
| Exam Way: | Pearson VUE proctored exam (online and test center delivery) |
| Pre Condition: | Basic understanding of IBM Power Systems portfolio and enterprise server concepts is recommended. |
| Official Syllabus URL: | https://www.ibm.com/training/ |
IBM C4040-123 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| IBM Power Systems Overview | - POWER7 architecture fundamentals
|
| Solution Design and Use Cases | - Enterprise workloads on Power Systems
|
| Virtualization and Resource Management | - PowerVM virtualization
|
| Operating Systems on IBM Power | - AIX on Power Systems
|
| Sales Positioning and Business Value | - Competitive differentiation
|
IBM Power Systems with POWER7 and AIX & Linux Sales Skills -v2 Sample Questions:
1. A prospective customer plans to implement a Linux application, but believes that the Linux distribution for Power Systems is a secondary development focus of the Open Source Community.
Which statement is a correct response to the customer?
A) The Linux for Power distribution is only one version behind the x86 distribution.
B) The Open Source community develops only one kernel and IBM adds extensions for Power Systems architecture
C) Red Hat and SuSe make sure the distributions of x86 and Power have the same functionality.
D) Linux for x86 and Linux for Power are identical except in the name.
2. What business requirement can be satisfied by implementing PowerSC on a virtualized Power 750?
A) A new Service Oriented Architecture environment is about to go live and potential threats must be prevented
B) Data files that exist on Windows file servers, Linux file servers and within the AIXfilesystems must be shared
C) Performance must be maintained once a new partition is created for a new business intelligence application
D) The primary production database requires 24x7 availability even when there is a failover to a remote site.
3. A customer has memory constraints and has the maximum amount of memory installed on the system. The customer asks if there are functions or products available to solve the problem without purchasing a second server.
Which function should be discussed?
A) Active Memory Duplication is a feature of PowerVM and will double the size of the memory pages.
B) Active Memory Mirroring is available as a hardware option and will mirror the memory to disk, doubling the amount available.
C) Active Memory Sharing is a PowerVM feature that will allow increased memory utilization and provide additional logical memory.
D) Active Memory Expansion is a hardware feature that will double the memory DIMM slots for additional memory support.
4. A hospital has several Power 750 servers, each using PowerVM Standard Edition with VIO Server (VIOS) connected to a SAN.
The customer plans to add a Power 770 and wants to use Live Partition Mobility (LPM) to move common workloads from some of the Power 750 systems to the Power 770.
What should be proposed to support the customer requirement?
A) PowerVM Enterprise Edition on the Power 770
PowerVM Enterprise Edition upgrades on the Power 750 systems
B) VMControl Enterprise Edition on the Power 770
PowerVM Enterprise Edition for each server running VIOS
C) Partition Load Manager on the Power 770
One licence of Partition Load Manager for each Power 750.
D) PowerVM Standard Edition on the Power 770
Systems Director LPM Agents for each server using VIOS.
5. The IT director of a data center has servers from Dell, IBM and Sun:
-The Dell servers run Linux -The Sun Servers run Solaris -The IBM servers run AIX.
Consolidation to fewer platforms is being considered.
What competitive advantage does the purchase of a new POWER7 server have over a new Sun T5 server for this customer environment?
A) Linux and AIX run natively on Power Systems servers.
B) Capacity on Demand resources can be activated in increments of one tenth of a processor core.
C) A POWFR7 system supports twice the number simultaneous threads per clock cycle of Dell and Sun systems.
D) WPAR5 can be implemented on an AIX system to support both of the UNIX and Linux workloads.
Solutions:
| Question # 1 Answer: B | Question # 2 Answer: A | Question # 3 Answer: C | Question # 4 Answer: A | Question # 5 Answer: A |


PDF Version Demo






We are confident about the products and aim to help you pass with ease. In case of failure, we will provide a no hassle full money back guarantee for the purchasing fee.
973 Customer Reviews
Quality and ValueITbraindumps Practice Exams are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development - no all study materials.
Tested and ApprovedWe are committed to the process of vendor and third party approvals. We believe professionals and executives alike deserve the confidence of quality coverage these authorizations provide.
Easy to PassIf you prepare for the exams using our ITbraindumps testing engine, It is easy to succeed for all certifications in the first attempt. You don't have to deal with all dumps or any free torrent / rapidshare all stuff.
Try Before BuyITbraindumps offers free demo of each product. You can check out the interface, question quality and usability of our practice exams before you decide to buy.